Description

The hostel at the former border crossing Hodonín / Holíče was reconstructed in 2012. The reconstruction included newly equipped public restroom with urinals, closets or token-operated shower automat.

Range of project

  • Customized wall-mounted wash trough
  • Stainless steel urinal AUP 03
  • Stainless steel closet with a reservoir and plastic seat
  • Accessories
  • Token-operated shower automat ZAS 3.TV
  • Surface shower unit AUS 3.P
  • Floor channels

Place of realization

StarTrack hostel, former border crossing Hodonín / Holíče

Investor

Building company

Photogallery